For excavation & underground utility contractors

Bid faster.
Bid right.

TrenchIQ replaces the bid spreadsheet. Keep your pricing in one place, build every bid from it, watch the math work itself out — and hand the owner a bid that foots to the penny.

Built with Beh Brothers Construction · Monticello, Utah

Sample bid · Section 1
Sewer Main
Saved
A sample bid section with four line items
ItemUnit priceTotal
1.018" PVC Sewer Main$68.42$84,840.80
1.0248" Sanitary Manhole$5,875.00$35,250.00
1.03Connect to Existing Manhole$3,140.00$6,280.00
1.044" Service Lateral$1,212.50$21,825.00
Section subtotal$148,195.80
1.01 · what’s in $68.42 / LFFoots ✓
  • Materials$24.86
  • Labor$15.74
  • Equipment$14.18
  • Overhead & markup$13.64
Built for the work you bidSewerWaterStorm drainEarthworkRoadwayPavingRestoration

The problem

One wrong cell costs real money

On a $2 million bid, a spreadsheet mistake is the difference between losing the job and winning it at a loss. And you rebuild that spreadsheet every time.

The spreadsheet

  • A formula dragged one row too far
  • Last job's tax rate, copied by accident
  • Unit prices rounded after the line was extended
  • Every bid starts from a blank sheet

TrenchIQ

  • The math lives in one place and is tested to the penny
  • Your rates, set once, applied to every bid
  • Unit price rounded first, so the bid always foots
  • Your catalog grows with every job you price

How it works

Plans in. Bid out.

  1. 01

    Bring the bid schedule

    Drop in the engineer's schedule — CSV, Excel or PDF. Every item, unit and quantity comes in, in order.

  2. 02

    Price from your catalog

    Materials, crews and machines you've priced before are one pick away. Overhead and markup work themselves out.

  3. 03

    Hand in a clean bid

    A professional PDF with your company on it, where every unit price times quantity equals its line total.

The whole walkthrough

What you get

Everything a bid needs. Nothing it doesn’t.

See inside every unit price

Every dollar traces back to a material, a crew hour or a machine hour. No black box, no guessing where a number came from.

Your catalog, reused

Price a line once, save it, and pull it into the next bid. Your numbers get sharper with every job.

Whole crews in one click

Add a crew and its equipment to a line item instead of entering each person and machine by hand.

Supplier quotes, read for you

Upload a quote and TrenchIQ suggests which bid item each price belongs to. Nothing changes until you confirm it.

Know where you stand

Load the bid tabulation from past lettings and see how your number compares to the competition's.

Saves as you type

No Save button. Undo when you need it. Save a version before you sharpen the pencil, and compare the two.

Every feature

The deliverable

A bid a city engineer accepts

The PDF is what you hand in, so it’s what TrenchIQ is built around. Your company, your license and terms, the owner’s schedule in the owner’s order — and a unit price rounded before it’s extended, so every line checks out when the engineer runs the numbers.

  • Bid schedule, full proposal, or summary
  • Warns you before printing if something's missing
  • CSV and a cost report for your own files
Sample Excavation Co.
License #000000 · Sample, UT
BID SCHEDULE
Page 1 of 3
Sample bid schedule page
No.DescriptionQtyUnit priceAmount
1.018" PVC Sewer Main1,240 LF$68.42$84,840.80
1.0248" Sanitary Manhole6 EA$5,875.00$35,250.00
1.03Connect to Existing Manhole2 EA$3,140.00$6,280.00
1.044" Service Lateral18 EA$1,212.50$21,825.00
Section 1 — Sewer Main$148,195.80
Authorized signature
Date

Your numbers stay yours

Your unit prices are how you win work. We treat them that way.

We never bid against you

Nobody at TrenchIQ uses your prices to bid, price work, or advise another contractor. It's written into our terms.

Walled off in the database

Every company's bids sit behind their own wall, checked on every read — including from our own team's console.

Yours to take, yours to delete

Your numbers belong to you. Never pooled, never sold, never used to train AI. Ask, and we export or delete them.

The details are in plain English in our privacy policy and terms.

How we protect your numbers
$500K–$3M
The bids it was built on

Built by a contractor, on real bids

TrenchIQ was built alongside Beh Brothers Construction in Monticello, Utah — sewer, water, earthwork and roadway jobs from $500,000 to $3 million. Every screen was checked against real bids by the person who has to sign them.

Closed beta

Become a Founding Tester

We’re opening TrenchIQ to contractors who bid unit-price work. Founding Testers who use it on real bids and tell us honestly what works get TrenchIQ’s estimating free, for as long as we offer it.

  • Use it on real bids for your company
  • Tell us what's slow, confusing or wrong — especially a number
  • A couple of short calls with the people who build it

Every tester is invited by us. The full conditions are shared before you start.

Ask for beta access

TrenchIQ is in a closed beta. Leave your details and we’ll email you when there’s a spot.

This is what tells us whether Trench is built for your kind of job yet.